![]() Took out floor boards that had many crazy cut out sections. Replaced with boards on attic floor, same vintage. Then i prepped and swept garage walls for garage shelving project "move". After rice eggplant dinner i will work on insulating basement stair well and adding fire blocking in preparation for dry wall. Purchased blue board at habitat AND 2 beautiful ceiling fixtures.
![]() These were full, David N is going to install them in garage at 610. I will be moving just about everything into garage, until drywall is installed. Notice given at 604, out by end of March. Today i install outlets, add fire blocking, replace floor boards that have holes, insulate under stairwell in preparation for fire code and drywalling. Oh! And enjoy the sunshine and mud.
![]() The foundation man, could'nt have done any of it w/o him. He is working so hard, shoring , jacking , excavating. He said " this could take several months" i replied i've got 6 weeks. Needs to be ready for dry wallers. Gave notice at 604 , out at the end of march. We removed walls to make it work, almost level. Now to rebuild, insulate and rewire.
|
M Shaw
|
MShaw-FolkArt.com |
|