Took out floor boards that had many crazy cut out sections. Replaced with boards on attic floor, same vintage. Then i prepped and swept garage walls for garage shelving project "move". After rice eggplant dinner i will work on insulating basement stair well and adding fire blocking in preparation for dry wall. Purchased blue board at habitat AND 2 beautiful ceiling fixtures.
These were full, David N is going to install them in garage at 610. I will be moving just about everything into garage, until drywall is installed. Notice given at 604, out by end of March. Today i install outlets, add fire blocking, replace floor boards that have holes, insulate under stairwell in preparation for fire code and drywalling. Oh! And enjoy the sunshine and mud.
The foundation man, could'nt have done any of it w/o him. He is working so hard, shoring , jacking , excavating. He said " this could take several months" i replied i've got 6 weeks. Needs to be ready for dry wallers. Gave notice at 604 , out at the end of march. We removed walls to make it work, almost level. Now to rebuild, insulate and rewire.
|
M Shaw
|
MShaw-FolkArt.com |
|